What are the effective ways to realize the benefits of MIM?
In the early design stage of product production cycle, the application of MIM technology is an effective way to realize the benefit of MIM. The GIAN will help you apply MIM technology, whether it's new products or existing traditional metal forming products.
Lead time?
The usual lead time for processing and sample delivery is 4-8 weeks, but the lead time can be shortened according to specific engineering requirements.
What's the annual demand?
Generally speaking, the average annual demand for a typical product should be more than 50K, but GIAN will consider any annual demand that is beneficial to the customer.
Is there a limit?
Like any other technology, MIM technology has its limitations, with a general maximum weight limit of 240g for a product (and, from an economic point of view, a general weight limit of no more than 50g). There are also problems with certain geometric properties (super thick or super thin sections). GIAN will advise you on the appropriate product design.