1, 100% inspection before shipment by gauge and labor. Also surface selection is required. 2, Satisfied packing,plastic bag, blister tray, carton,pallet,or according to your requirement. 3, Samples delivery time is 25-30 days after the receipt of the deposit 50%. production will be finished about 30 days after samples confirmation.
Material: 304/316L, 17-4ph.
Tolerance: ISO-2768F.
Technology: Metal injection moulding+ CNC+Sandblasting
the steel MIM parts are fit for custom electric locks, combination lock .
● ISO 9001:2009 and Military Industry Qualification
1, 100% inspection before shipment by gauge and labor. Also surface selection is required.
2, Satisfied packing,plastic bag, blister tray, carton,pallet,or according to your requirement.
3, Samples delivery time is 25-30 days after the receipt of the deposit 50%. production will be finished about 30 days after samples confirmation.
Packing Requirements:
neutral packing , carbon packing, and as according to your requirements
If you are interested in lock button, please send me 2D or 3D drawings, and then we will evaluate them and offer you a nice price
Shandong No2 Machinery Company | |
ADD:No.1,Huan Road,Hutian,Zibo,Shangong,Province,China | |
Phone:+86-533-2070506 | |
E-mail:sales@no2machinery.com | |
Skype:bretchen1128 |